Appeal 3328834
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
9 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
a two storey rear extension to match existing house with hipped roof.
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary Matters
Following submission of the appeal, the revised National Planning Policy Framework (the Framework) was published on 19 December 2023 and updated on 20 December 2023. Other than the paragraph numbers, the provisions in the revised Framework relating to the Green Belt are the same as those that were in the previous version of the Framework when the Council made its decision. Therefore, it has not been necessary to seek the views of the main parties on this matter.
Section 04
[name]
The main issues are: • Whether the proposal would be inappropriate development in the Green Belt having regard to the revised Framework and any relevant development plan policies; • The effect on the openness and the purposes of the Green Belt; and • Would the harm by reason of inappropriateness, and any other harm, be clearly outweighed by other considerations. If so, would this amount to the very special circumstances required to justify the proposal.
Section 05
Reasons
Paragraph 154 of the Framework states that the construction of new buildings is inappropriate in the Green Belt but it sets out a number of exceptions. This includes at 154 c) the extension or alteration of a building provided that it does not result in disproportionate additions over and above the size of the original building. Saved Policy N33 of the Leeds Unitary Development Plan Review 2006 (UDP) permits the ‘limited’ extension of existing dwellings as opposed to additions that are not disproportionate, but its aims are broadly consistent with those of the more recent Framework.
There is no definition as to what represents a disproportionate addition over and above the size of the original building. However, the Council’s Householder Design Guide 2012 (HDG) sets out at Policy HDG3 that in order to be considered as limited development all existing and proposed extensions should not exceed a thirty percent increase over and above the original house volume. It is further advised in the accompanying policy text that although this figure is not definitive, it will inform the majority of decisions involving Green Belt applications.
The host dwelling is a semi-detached property with a two storey side extension. The plot is enclosed to its side and rear garden. The proposed extension would extend from the two storey side element to the rear of the original forming an addition of substantial mass. The appellant has stated that proposal would increase the volume of the original dwelling with an increase of around 76%. The host property has already been substantially extended and the proposal will introduce additional two storey development. It would also result in an overall volumetric increase above the size of the original property.
I therefore conclude the extensions subject to this appeal would represent disproportionate additions over and above the size of the original building. Consequently, the proposal would be inappropriate development in the Green Belt as defined by The Framework. It would also not represent a limited extension under Saved Policy N33 of the UDP or Policy HDG3 of the HDG.
Section 06
Openness and purposes of the Green Belt
A fundamental aim of Green Belt policy, as set out by The Framework, is to prevent urban sprawl by keeping land permanently open. Openness is, in effect, the absence of development and it has both a spatial and visual aspect to it. The Framework further sets out at paragraph 142 that the Green Belt serves five purposes.
I do not consider that the proposal would conflict with the purposes of the Green Belt. However, on consideration of the scale of the development, the proposal would result in infilling an area at ground and first floor elongating the side elevation of the current extension. Whilst enclosed and not immediately prominent from the streetscene, the development would be visible in glimpsed views from and across neighbouring gardens, particularly at first floor.
As such the proposal would result in loss of spatial and visual openness where there was previously no built development. Whilst the loss of openness is limited, nevertheless I conclude that this results in harm to Green Belt openness, and the proposal is contrary to the aims of the Green Belt contained within paragraph 142 of the Framework set out above.
Section 07
[name]
The Council has not raised concerns about the visual aspect of the design and it would not harm neighbouring living conditions, highway safety and would retain acceptable levels of parking. However, these are neutral matters that do not weigh for nor against the proposal.
I acknowledge that the Council approved an extension which exceeded their guidance at the adjoining dwelling of Appletrees. However, it appears that the additional extension involved the demolition of existing development and therefore consolidated development on the site. Furthermore it is clear that other considerations such as the appearance of the property and the wider street scene were considered to be significantly enhanced by the development. The same benefits cannot be said to be derived from the appeal proposal, which would have limited visibility from the street.
The massing and form of the appeal extension is also larger and not identical to Appletrees. Having a hipped roof and overall greater mass, the appeal proposal would be larger and bulkier than that of Appletrees. I therefore only attribute limited weight to this and the appeal decision1 which drew very special circumstances from a complementary form and recent planning decision.
The need for additional accommodation at a residential property, the position within a residential area and its limited visibility are not circumstances that could be said to be uncommon or unusual. These considerations therefore carry only limited weight in support of the proposal.
Section 08
Green Belt Balance
Paragraph 153 of the Framework states that when considering any planning application, local planning authorities should ensure that substantial weight is given to any harm to the Green Belt. ‘very special circumstances’ will not exist unless the potential harm to the Green Belt by reason of inappropriateness, and any other harm resulting from the proposal, is clearly outweighed by other considerations.
There would be a reduction to visual and spatial openness. I acknowledge that the level of harm would be limited. However, the proposal would be inappropriate development which would be harmful. This harm carries substantial weight by definition.
The other considerations, and the examples of other planning decisions referred to above do not clearly outweigh the substantial weight that I must give to the harm to the Green Belt, by reason of inappropriateness and effect on openness. This is a high hurdle for any development proposal to overcome. I conclude that the very special circumstances necessary to justify the development do not exist which clearly outweighs the inherent harm to the Green Belt.
The proposal is contrary to saved policy N33 of the UDP which only gives approval for limited extensions in the Green Belt. The proposal would conflict with chapter 13 of the Framework, which seeks to prevent disproportion additions to a building in the Green Belt. There would also be conflict with HDG3 of the HDG which sets a thirty percent increase for limited development and seeks to resist proposals that harm the openness of the Green Belt. 1 Appeal Ref: APP/T0355/D/22/3300670
Section 09
Conclusion
For the reasons given above and having regard to all other matters raised, the proposal is contrary to the development plan, and I conclude that the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted decision date · page 1
- 31 May 2024Matches the official casework database
- Extracted site visit dates
- 16 May 2024 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3328834
- Application reference
- 23/03886/FU
- Lead case reference
- Not recorded
- Planning authority
- Leeds City Council
- Planning authority code
- E08000035
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 24 m²
- Number of residences
- 0
- Site in Green Belt
- Yes
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 4 September 2023
- Valid date
- 4 September 2023
- Start date
- 19 September 2023
- Planning authority decision date
- 22 August 2023
- Appeal decision date
- 31 May 2024
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 51803
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21