Skip to main content

London Borough of Havering appeal evidence

Refused over GPDO extension limits in Havering?

See what selected Havering GPDO decisions say about original walls, width and earlier extensions.

Recently refused?

Create a free account for a private planning workspace.

Create a free account

No payment at signup. Refusal-review ordering may not be open.

Matched locally
16 of 331
eligible decision families
Allowed
7
matched appeal records
Dismissed
9
matched appeal records
Householder
16
of 16 matched records

AI-assisted. Cited sources and wording were checked before publication. Based on 5 source-linked examples shown below. Review method and limits.

Cut-paper illustration of an imaginary permitted development dimensions and building relationships planning issue in Havering, with simplified local landmarks.
Upminster station and Damyns Hall Aerodrome mark Havering.

Planning Data area point: Havering LPA (51.563125, 0.220447). This is the published representative point for the authority boundary, not a town hall, camera position or appeal site.

London Borough of Havering appeal findings

How Havering GPDO extensions were measured

The displayed examples have a different outcome mix from the matched local set. The allowed extract does not explain why the appeal was allowed.

Counted against appeals

When GPDO extensions failed Class A

  1. Earlier enlargement counted with new work

    The Inspector added the proposed rear extension to an earlier enlargement when applying the GPDO limits.

  2. Bay removal did not move the line

    Removing a bay did not move the starting line. The Inspector used the original footprint and found the proposal extended beyond a side wall.

  3. Width beyond a side wall

    The width restriction did not apply only to the part beyond a side wall. Filling the corner still triggered both restrictions.

Helped or needed

Original-house baseline in allowed extract

  1. Identify the original dwellinghouse

    The allowed extract says the GPDO definition of the original building can depend on when it was built. It gives no further allowance reasoning.

Your refusal notice

Check these details

  1. Does the refusal notice identify the original dwellinghouse footprint and construction date?
  2. Are earlier extensions included with the proposed work?
  3. Would the extension cross a side wall or exceed half the original width?

The displayed allowed extract does not say why the Inspector allowed the appeal. These decisions do not predict another result.

Appeal evidence examples

Compare allowed and dismissed appeal reasoning

Each example separates the development, the Inspector-stated issue that selected it, and the reasoning from the decision. Compare the facts as well as the outcome: these examples do not predict how a different proposal would be decided.

Allowed appeal examples

1 example

  1. 6000655

    22 December 2025 · Allowed

    Development described in the decision

    No verified development description was available for this example.

    Issue identified by the Inspector

    Given the above, the main issue is whether the proposed development would be granted planning permission by Article 3, Schedule 2, Part 1, Class A of the GPDO.

    Paragraph 5 · Source page 2

    Reasoning from the decision

    The Council specifically refused prior approval because it deemed the proposed development to not comply with limitation A.1(j)(iii) under Schedule 2, Part 1, Class A of the GPDO. This sets out that development is not permitted under Class A if the enlarged part of the dwellinghouse would extend beyond a wall forming a side elevation of the original dwellinghouse and would have a width greater than half the width of the original dwellinghouse. In relation to a building, the GPDO defines “original” as, amongst other things, a building existing on 1st July 1948, as existing on that date; or if built on or after 1st July 1948, as so built.

    Paragraph 6 · Source page 2

Dismissed appeal examples

4 examples

  1. 3315695

    19 July 2023 · Dismissed

    Development described in the decision

    described as “single-storey rear extension”.

    Issue identified by the Inspector

    The main issue is whether the proposed development satisfies Schedule 2, Part 1, Class A of the GPDO.

    Paragraph 4 · Source page 1

    Reasoning from the decision

    For the above reasons, I conclude that the proposed development would not comply with paragraph A.1(j) of Schedule 2, Part 1, Class A of the GPDO.

    Paragraph 10 · Source page 2

  2. 3292842

    20 October 2022 · Dismissed

    Development described in the decision

    described as “Single storey rear extension with a depth of 2 metres. Combined depth of 6 metres from the original dwellinghouse”.

    Issue identified by the Inspector

    The main issue is whether the proposal would be permitted development as provided for by Schedule 2, Part 1, Class A of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) (hereafter “the GPDO”).

    Paragraph 2 · Source page 1

    Reasoning from the decision

    The appellant considers that “while the existing is [a] part single and part two storey rear extension, the proposal will project beyond the single storey element and therefore the proposal will fall within permitted development requirements”. However, [name].1.(ja) of the GPDO states that development is not permitted by Class A if “any total enlargement (being the enlarged part together with any existing enlargement of the original dwellinghouse to which it will be joined) [my emphasis] exceeds or would exceed the limits set out in sub-paragraphs (e) to (j)”. Page 23 of the technical guidance1 provides a practical summary of how this is applied: “For example, if a proposed extension of 3 metres in height is added to an existing extension which exceeds 4 metres in height, or if the proposed extension creates a total enlargement which has a width greater than half the width of the original dwellinghouse, it would not be permitted development.”

    Paragraph 5 · Source pages 1, 2

  3. 6000155

    29 September 2025 · Dismissed

    Development described in the decision

    single storey rear extension.

    Issue identified by the Inspector

    The main issue is whether the proposed development would be granted planning permission by Article 3, Schedule 2, Part 1, Class A of the GPDO.

    Paragraph 4 · Source page 1

    Reasoning from the decision

    The limitation (j) width restriction does not solely apply to the part of the extension that extends beyond a side wall of the house. The Technical Guidance clearly advises that where an extension fills the area between a side elevation and a rear wall, then the restrictions on extensions beyond rear walls and side walls will both apply. If a proposed extension extends beyond a side wall and is more than half the width of the original house, it would not be permitted development and an application for planning permission would be required.

    Paragraph 10 · Source page 2

  4. 3297802

    29 December 2022 · Dismissed

    Development described in the decision

    single storey rear extension with an overall depth of 6m, a maximum height of 3m, and an eaves height of 2.80m. ([name]).

    Issue identified by the Inspector

    The main issue is whether the proposal would comply with Schedule 2, Part 1, Class A of the GPDO.

    Paragraph 3 · Source page 1

    Reasoning from the decision

    The bay would be removed as part of the proposal. However, for the purposes of calculating the limitations of permitted development, the starting point should be the location of the original wall, based on the original footprint of the dwellinghouse, whether the wall would be demolished or not. On that basis, the proposal would extend beyond a wall forming a side elevation of the original dwellinghouse i.e. the walls that form part of the bay. The proposal would also have a width greater than half the width of the original dwellinghouse. Consequently, the proposal would fail to comply with Schedule 2, Part 1, Class A, [name].1(j)(iii) of the GPDO.

    Paragraph 6 · Source page 2